PROJECT LOCATION CLIENT COMPLETION DATE
Repair works on Boilers at OBOB Gas Plant OB/OB NAOC Ongoing
Repair Works on 20’’ and 24’’ NGC Gas Pipelines (Call-Off Contract) Swamp Areas Nigerian Gas Company Ongoing
Turn Around Maintenance (TAM) at OBOB Gas Plant OB/OB NAOC Ongoing
Procurement and replacement of roof gutter at control room/Construction of Septic tank for security post Itoki WAGPCO Ongoing
Maintenance of Land Area CP System Land Area NAOC Ongoing
Removal of Bunkering Points (Leak Repairs) /Sectional Replacement of Pipelines (32”, 24”, 6”) All Land Area NAOC Ongoing
Statutory Inspection of SAR Flow Station Production Facilities (call-off contract) Swamp Area, Obama. NAOC Ongoing
Supply of water Maker Spare Parts (Call off contract) Agbara Platform NPDC Ongoing
Replacement of LBCS 331msq Turbine Shelter Roof LBCS WAGPCO Ongoing
Inspection and Maintenance of Cathodic Protection System JUHI Ikeja Ongoing
Repair of the Coating Defects on Pipelines JUHI/MM2, Ikeja Total PLC Ongoing
Inspection and Maintenance of Cathodic Protection System KOKO Delta State Total PLC December 2021
Repair of the Coating Defects on Pipelines Koko Delta State Total PLC December 2021
Construction of Pedestrian Walkway to office buildings and Access Control Fence around Process Area PRMS, OTA Shell Nigerian Gas November 2021
Procurement of Piping Material for Replacement of DNV CC-107 Piping in Engine Room. Abo FPSO BW Offshore October 2021
Quarterly Cathodic Protection Idama, Robertkiri and Ndah field Belema oil Producing October 2021
Provision of Anode Ground bed Installation Services on JV onshore Facilities. Total onshore Facilities Total E&P August 2021
Procurement of Operational and Maintenance Tools PRMS, Agbara, PH and Aba Offices Shell Nigerian Gas August 2021
Procurement of 12” PE coated pipes Land Area, Yenagoa NAOC June 2021
Mast inspection using rope access LBCS Badagry, Lagos state. WAGPCO June 2021
Mast inspection using rope access Itoki, Ogun state. WAGPCO June 2021
Mast inspection using rope access Cotonou, Benin Republic WAGPCO June 2021
Repair of HDPE Pipe at Cotonou Cotonou, Benin Republic WAGPCO June 2021
Scaffold erection at flare arrestor Itoki WAGPCO June 2021
Procurement and installation of emergency eye wash/shower LBCS and ITOKI WAGPCO June 2021
Fabrication and replacement of damaged portion of gas cylinder shelter LBCS, Badagry WAGPCO June 2021
Replacement of damaged portion of logistics and IT office LBCS WAGPCO June 2021
Servicing and Greasing of Flow lines Valves Agbara Platform NPDC June 2021
Provision for Directional Drilling (DD) Services for LBCS/Badagry LBCS, Badagry WAGPCO November 2019
Construction For Remedial Works on Failed and Unmotorable Sections of Concrete Road Okpoama In Brass L.G.A Bayelsa State. NDDC October 2020
Hydrotest on Train 1 and 2 Cooler Bundle LBCS WAGPCO June, 2020
Erosion Control on KP46 ROW Itoki WAGPCO March, 2019
Cleaning of Skid, Pig Receiver trench and piping LBCS, Badagry WAGPCO March, 2019
Renovation of Staff Residential Area LBCS, Badagry WAGPCO March, 2019
Procurement and installations work for GTS Cornelius Oshiobor, 1,2,3,4,5 Pipeline CP System (Call-off contract) NLNG Bonny NLNG December, 2019
Annual Pipeline Condition Survey Gelegele Field Dubri Oil December, 2019
Turn Around Maintenance (TAM) of Natural Gas Liquid Plant. OB/OB NGL NAOC, Sublet by FODE November, 2019
Statutory Inspection of MP Separator 3100-PS 201 Kwale Gas Plant NAOC November, 2019
Wrapping of Pipeline Agbara Platform AENR October, 2019
Fabrication and Installation of Emergency Sign Post LBCS WAGPCO October, 2019
Flushing, cleaning and PSV Calibration and certification of 320-PS-1 Separator OB/OB NGL NAOC October, 2019
Statutory Inspection and Certification of LPS-3 Separator Ebocha Flow Station NAOC October, 2019
Construction of Containment Berm for LBCS mobile Air Compressor Badagry WAGPCO October, 2019
Monitoring and Maintenance of CP System for JUHI Depot (Call off contract) JUHI Depot Total PLC September, 2019
Removal of sludge, cleaning and certification of Ogbainbiri sludge catcher at unit 4520 OB/OB NGL NAOC August, 2019
Revamping and Commissioning of 1420-FA- 01B (Gas Dehydration Heater B) OB/OB NGL NAOC August, 2019
Installation of Kerbs over 1km at LBCS Badagry WAGPCO August, 2019
Temporal Erosion Control at KP46 ROW Itoki WAGPCO July, 2019
Replacement of Deteriorated Test Box for Cathodic Protection at Airport Tarmac Total JUHI Total Lagos July, 2019
WAGPCO Right of Way Erosion Control at KP 46, KP51.7, KP51.9 and KP52.3 ITOKI WAGPCO May, 2019
Regeneration column unit 1670 -VE-02A internal tray replacement OB/OB NGL NOAC, subletted by FODE May 2019
Construction of LBCS Internal Drainages LBCS Lagos WAGPCO April 2019
Replacement of corroded Roof and Gutter of Gas Turbine and Generator Shelter LBCS- Lagos WAGPCO March, 2019
Building of Security Office on Swamp Area, Egbema Egbema NPDC March 2019
Construction of Foundation slab for 500KVA generator set in LBCS LBCS- Lagos WAGPCO January, 2019
Well 6 pipeline replacements Agbara Platform AENR Feb 2019
In-service Vessel Recertification Kwale Gas Plant Amazon- Energy December 2018
Design Installation and Commissioning of Ground Bed Land Area OB/OB, Oshi & Ebocha NAOC December 2018
PMI Testing & Fit for Service Inspection of Pressure Vessels Ebocha Oil Center Sudelettra Nigeria Limited October 2018
XYZ Mapping and Delineation of Pipe line from Depot to Jetty APAPA LAGOS OVH Energy June 2018
Statutory Inspection of IDU Fuel Gas Scrubber, PSV Idu Flow Station NAOC April 2018
Maintenance of Fire Fighting Pumps A & B in Agbara Platform on Call out Basis Agbara Platform NPDC July 2017
Supply and Maintenance of 3 Unit Crude Oil Delivery Pump Agbara Platform NAOC November 2016
GTS Cathodic protection (Call of contract) NLNG NLNG November 2016
Quarterly monitoring of the CP system at Ibafon on call off contract Ibafon Depot Total Plc November 2016
EPC for Fiscal Gas Metering System Installation for Gas Supply for Indoroma OB/OB Gas Plant NAOC September 2016
EPC for 3km access road, covet bridge, guard house and staff quarters. BUA Cement PLANT BUA June 2016
Thermal Insulation for Sulzer Turbine Pump TP-09. Brass Terminal NAOC September 2015
EPC for Replacement of Area 2 Corroded Platform for 12D02 Eleme PHC Refinery July - August 2015
Procurement of 6" X 10KM Schedule 120 PE Coated Line Pipe NAOC Yard NAOC March 2015
Pre-commissioning and Commissioning of Transformer Rectifier in Train 1 to 6 Bonny NLNG Dec. 2014
Positive/Negative Cable Laying at Rumuji Node Rumuji NLNG/ Total E&P Dec. 2014 – Jan. 2015
DCVG Integrity Survey Rumuji, Bonny NLNG Oct – Dec. 2014
Design and Fabrication of Vandal Proof Solar Panel System Weatherford Yard Weatherford April 2014
EPC for Replacement of 4800m 4” Flowline from Ebocha to Ebocha Oil Centre Ebocha to Ebocha Oil Centre NAOC March-July 2014
Procurement of Bulk Valves for Brass Terminal Tanks Drainage Modification. NAOC NAOC Dec. 2013
Procurement of Flow Measurement Accessories and Line Pipes for Brass Terminal Tanks Drain Modification. NAOC NAOC Sept., 2013
Thermal Insulation of Cold and Hot Lines in Land Area (Call off contract phase II). OB/OB NAOC Sept., 2013
Procurement of 3½ SML Tubing, OD 9.20PPF, Grade, 13% CR/85 Chrome, R2 Sept., 2013 Asita P., M. Ojiyi Premium connection, JFE Bear Run NAOC NAOC May 2013
Offshore CP Monitoring at OML 100, 102, FSO Unity and OML 99 Total E & P Total E & P Jan, 2013
Coating Activities in Land Area of NAOC NAOC NAOC Dec., 2012
Inspection, Evaluation & Diagnosis Services for Swamp Area Pipelines, Flowlines and Process lines. (Call Off Contract) Swamp Area Pipelines, Flowlines and Process lines NAOC Dec., 2012
Refurbishment of the CP System Koko Jetty Total PLC Oct. 2012
Inspection, Evaluation & Diagnosis Services for Swamp Area Pipelines, Flow lines and Process lines. (Call Off Contract) Swamp Area Pipelines, Flowlines NAOC July, 2012
Engineering, Construction, Procurement and Commissioning of Cathodic Protection for 32 km pipeline 8” NPDC Line NPDC April, 2012
Installation of Transformer Rectifier and Commissioning Koko jetty Total PLC April, 2012
Concrete Works at Jetty and Shore Protection Oganama, Okrika Rivers State. NDDC October 2012
Clearing, Excavation/Earthworks, reclamation works Oganama, Okrika Rivers State. NDDC October 2012
Offshore CP Monitoring at OML 100, 102, FSO Unity and OML 99 OML 100, 102, FSO Unity and OML 99 Total E & P Jan, 2012
Installation of transformer Rectifier and Commissioning Ibafon Depot Total PLC Dec., 2011
DCVG Survey and Remedial works on Amenam – Bonny Pipeline On-shore section Bonny Total E&P Dec. 2011- Jan. 2012
Installation of Transformer Rectifier and Commissioning JUHI Depot Total PLC Nov., 2011
Delineations of the ROW and installation of marker post between JUHI and MMA International Between JUHI and MMA Total PLC Oct, 2011
Upgrading of the CP System at JUHI depot JUHI depot Total Nig PLC May 2011
Refurbishment of the CP System at Ibafon Depot Total Nig PLC Total Nig PLC Feb 2011
Offshore CP Survey of OML 99, 100, 102 and FSO Unity and Calm Buoy OML 99, 100, 102 and FSO Unity and Calm Buoy Total E&P Dec 2010
Repair of Leaking Points on the Floating Roof of Crude Oil Storage Tanks at (Call-off Contract) Brass Terminal NAOC Dec., 2010
Diving survey of Jetty Piles at Koko Delta State to determine the CP status Koko, Delta State Total Nig PLC September 2010
Supply of H-Beam, Angle Iron AGIP AGIP ENERGY September 2010
Replacement of 11 nos. Insulating Joints at Ogbainbiri Flow station Arrival Manifold Ogbainbiri Flow station NAOC July 2010
Supply of Piping and Accessories AGIP AGIP ENERGY July 2010
Offshore CP Survey of OML 99, 100, 102 and FSO Unity and Calm Buoy OML 99, 100, 102 FSO Unity and Calm Buoy Total E&P Jan 2010
Supply and Installation of High Silicon anode for Utorogu Gas plant CP system upgrade Utorogu Gas SPDC Dec 2009
Statutory Inspection for Land Area Flow station (Call Off Basis) phase 1 and 2 Land Area Flowstation NAOC Nov 2009- Oct 2011
Installation of Aluminum and High Silicon Anode in Tanks 3 Ogbogu Flow station and Olo Flow station Tanks 3 Ogbogu Flow station and Olo Flow station Total E&P July 2009
Refurbishment of 22 nos. Premixers and Painting of Process and Firewater lines in Brass Terminal Brass Terminal NAOC April 2009
Design of CP System KOLOLESS for ADDAX ADDAX field ADDAX Dec. 2008
Leak Repairs Points, Pipe/Flow Line (Call off Contract Basis) Flow Line NAOC Dec. 2008 – Dec. 2010
Internal Corrosion Monitoring of Production Facilities in Swamp Areas. (Call Off Contract) Swamp Areas NAOC Dec 2008 - Dec 2010
Construction and Installation of Gas Flare Stalk at Tebidaba Tebidaba NAOC Oct 2008
Installation of a Solar Panel at Rumuekpe. Rumuekpe. Total EPNL Sept. 2008
Sectional Replacement of Leaking 4” Gas line Obama – Brass fuel Gasline NAOC July 2008
Clough Creek Well 5 Flowline 4" Piping Linkage to 10" Clough Creek- Tebidaba Trunkline Tebidaba Trunkline NAOC April 2008
Trenching, Pulling and laying of Fibre Optic Cable at OB/OB gas plant Obiafu OB/OB gas plant, Obiafu NLNG March 2008
N-Lines in land Areas (Call off contract). OB/OB NAOC Dec 2007 - Dec 2010
Construction and Installation of Gas Flare Stalk Tebidaba. NAOC Oct 2007
Thermal Insulation of facilities for Unicem Gonzalez Miguel, Engr. Awak Cement factory Calabar. ORASCOM May 2007
Pipe Modification and Installation of Additional Hydrant Tanks LPG Plant Benin. Total Plc Dec. 2006
Construction of Deep Anode Groundbed at Elf Metering Station Rumuekpe. Total EPNL Dec. 2006
OML 100 CO2 Bottles Re-certification. TEPNL May, 2006
Replacement of Corroded Portion on Flow line Kwale-6 Cluster. NAOC April 2006
Materials for Unit 1630 A/B Cold Insulation OB/OB Gas Plant. NAOC Feb. 2006
Sacrificial Anode Cathodic Protection Ibafon Depot. Total PLC Feb. 2006
Insulation of Unit 420 Re-generator Cell OB/OB Gas Plant. NAOC July.2005
Verification Dig on various SPDC pipelines (Land Locations, East) Call Off Contract. DSV Pipetronix SPDC July.2005
Ultrasonic Thickness Measurements of Production Vessels in OB/OB Gas Plant. OB/OB Gas Plant. NAOC June 2005
Equilink of flowlines, cad welding, fault investigation on negative cable, installation of magnesium anode. Total: EPNL Total EPNL June 2005
Installation of Hot Insulation on Unit 420 A OB/OB Gas Plant. NAOC June 2005
Insulation of Unit 420-B Re-generator Cell NAOC May 2005
Supply and installation 1 x 16mm2 PVC/PVC, Aluminum and Zinc Anodes, Junction box and CP design Obagi, Olo & Obite Total EPNL Dec. 2004
Supply and Installation of 1 x 95mm2 PVC/PVC, 1 x 35mm2 PVC/PVC, 1 x 25mm2, 4 x 16mm2 SWA/PVC/PVC, HSC1 Anodes. Obagi, Olo, Obite & Rumuekpe Total EPNL Oct. 2004
Replace Cut Section of RC I Carrier Cable (100m) and Install Test Posts. Total EPNL Oct. 2004
Installation of Sacrificial Anodes on Five Well Heads. Equipotential Link at Well Head. Well Head. Olo Total EPNL Oct. 2004
CP Potential monitoring at Well Head Locations, on 6” Olo& 12 Obagi, Repair of RCI Anode Cable. Olo & 12 Obagi Total EPNL Oct 2004
Fault Investigation on RC I Anode Cable, Supply & Installation of Test Post, Junction Box, 1x 16mm2 Cable, Refurbishment of Test boxes, Equilink of F/L, Termination of Cables. Ibewa, Olo,Obite &Ogbogu F/S Total EPNL April 2004
Supply and Installation of Mg. Anodes, Coke Breeze, 1x16mm2 Cable, 1x 150mm2 Cable, 1x 240mm2 Cable, Equilink of Flowlines, Fault, Investigation of Positive Cable to RC I Ibewa, Olo, Obite & Ogbogu F/S Total EPNL March 2004
Statutory annual Cathodic protection survey of OML 99 offshore platforms and FSO Unity OML 99 offshore platforms and FSO Unity Total EPNL Feb. 2004
Cleaning and Painting of Metal Roof RC 1, 2, 3 Shelter, Refurbishing of Test Boxes.
Decoating & Repairs of Two Section of 12” Export Line. Ibewa, Olo, Obite &Ogbogu F/S Total EPNL Feb. 2004
Statutory annual CP survey of OML 100 & OML 102 Offshore platforms. OML 100 & 102 Offshore Total EPNL Jan. 2004
Supply of 8” steel casing pipes sch 80 API threaded ends Oilserve for Gaslink Ltd. May 2003
Procurement, Installation & Commissioning of CP system for pipeline to Ikeja Industrial Consumer, Phase IB Ikeja Industrial Consumer, Phase IB Oilserve for Gaslink Ltd Jan- May 2003
Cathodic Protection (CP) Service for OML 58 (Call off contract) OML 58 Total E&P Jan 2003- Dec 2011
Statutory annual CP surveyof flowlines, Gas lifts lines and other facilities at OML 58. Ogbogu, Obagi Obite Olo & Rumuekpe Total EPNL Nov. 2002
Statutory Inspection of storage tank C Vessels, pipingsetc) Upomami Tank farm. Total EPNL Feb.2002
Annual CP survey of OML 58. OML 99, 100, 102 FSO Unity and Calm Buoy Total EPNL Sept 2001
Isolation of flowline and gas lines at the insulating joints, establishment of missing equi-potential links. Total EPNL Sept 2001
Statutory integrity check by ultrasonic thickness measurement of COZ cylinders. Total: EPNL Yard Total EPNL May – Dec 2001
Cathodic protection on gas supply to Lagos Industrial areas. NGC Saipem contracting Nigeria Limited April 2001
Coating integrity survey of selected SPDC pipelines using DCVG (Direct Current Voltage Gradients) technique. SPDC Flow station Arista Nig. Ltd. Sept 2000.
Cathodic Protection Installation along NNPC PHC - Aba- Enugu 12” Multi-product P/Line. NNPC PHC - Aba- Enugu Newteck for NNPC Feb -March 2000
ISO 9001:2015, ISO 14001:2015 and BS OSHAS 18001:2007 CERTIFIED

Get an Unforgettable Experience With Mamtech Services Today!

We are the  best at what we do